Install Baker Hand pump w/ (2) 21' threaded rods w/ couplings and suction end.
Replace well tank with WR120 tank
Install lateral lines and a Grudnfos constant pressure pumping system. - CU301 VFD - 5GPM 1.5 HP SQE 230V pump - Stainless stell manifold - Well Extrol 102 buffering tank
Install a metered 48K Clack water softener w/brine tank and WS1 digital filter valve Install a regenerative Katalox based iron removal system w/ WS1 filter valve. All labor and equipment provided. The fittings line item is subject to change. The equipment is in stock. Labor is taxed and the equipment and fittings are not.
New home transfer of deed well inspection
Twin Arsenic Removal System Installation