Drained boiler and zones of all water. Cut and removed the boiler, zone valves, flue pipe, and nearby piping. Installed new Weil McLain boiler, 3 circulator pumps, flue pipe, and zone panel. Reconnected the intake air kit and oil line. Filled system with water. Purged all zones. Started and tested the system.