Performed a heating pm on an oil boiler. Brushed and vacuumed. Replaced the oil filter, nozzle and strainer. Started and checked the safeties. Performed a combustion test. 5.2% o2, 35 ppm, 82.2% efficient System is operating properly. The chamber is starting to crack and deteriorate. Recommend replacing the chamber inside the boiler next year