Brushed and vacuumed flue pipe and heat exchanger Replaced oil filter, nozzle, and strainer Checked all electrical connections and safeties Performed combustion and smoke tests 9.0%o2 2ppm co 0 smoke While performing the maintenance we found high levels of sludge at the oil filter. After getting customer authorization we added sludge additive to the tank.