Performed a heating pm on an oil boiler. Brushed and vacuumed. Replaced the oil filter, nozzle and strainer. Replaced the air filter, customer supplied. Started and checked the safeties. Performed a combustion test. 5.6% o2, 36 ppm, 87.3% efficient System is operating properly.