Excavate wellhead and raise with welded 6" steel. Install a new pitless adapter (if needed) Install a new 2 wire 230V submersible well pump and wire. Either a 1/2 HP or 3/4Hp pump. Replace existing well wire and linear footage to be determined. For purposes of this estimate we are assuming 200' of 12/2 flat jacket wire and this is subject to change. Install a new well cap and chlorinate the well. Site work restoration is the responsibility of the homeowner and we work to limit the area of disturbance. A NJ one call will be made on an emergency basis.