6220 Lower York Rd
New Hope, PA 18938
(267)406-6050

Job Locations
for stockton, nj


Map of Stockton NJ
Chris G.

Chris G.


Job Checkin

Convert existing well pumping system to a Grundfos variable frequency constant pressure system. Install a Pioneer dense carbon block 5 micron PFOS removal system. - CU301 variable frequency drive - WX 102 well tank mounted on a stainless steel manifold - SQE series soft start VFD submersible pump, 22 gallons per minute, 1.5HP - Install new double jacket flat well cable (wire in the well) -Replace schedule 80 well pipe with 160PSI black pipe. Provide all labor, equipment and fittings to complete the work.