Cut Sheetrock behind tub in downstairs bathroom fixed leaks on hot and cold by tub valve put isolation valves to tub valve cut Sheetrock at pipe chase at kitchen entry fixed leaks on cold side running up chase to behind master toilet also had to cut both sides of lavatory walls to repair multiple leaks on hot and cold and cut behind master tub wall to fix leak on cold side