Drained pressure from the system. Remove old hi-vents, autofeed, and pressure relief. Installed new hi-vents, autofeed, and new pressure relief. Filled the system back up with water and purged all air out of the system. Started and tested the unit. Ensured hot water is coming back to the boiler. When leaving boiler pressure was at 20 psi.