413 Rail Overlook
Adairsville , GA 30103
770-769-4033

Job Locations
for powder springs, ga


Map of Powder Springs GA
Stephen L.

Stephen L.


Job Checkin

Installed dedicated 20A, 120V circuit for new microwave per NEC 210.11(C)(2). Ran 12/2 AWG NM-B cable from existing panel to specified location, securing with appropriate staples. Installed new single receptacle in a dedicated box, ensuring proper grounding to the equipment grounding conductor. Verified voltage and polarity at the outlet. Circuit breaker labeled accordingly. Free estimate for future electrical needs.

Installed dedicated 20A, 120V circuit for new microwave per NEC 210.11(C)(2). Ran 12/2 AWG NM-B cable from existing panel to specified location, securing with appropriate staples. Installed new single receptacle in a dedicated box, ensuring proper grounding to the equipment grounding conductor. Verified voltage and polarity at the outlet. Circuit breaker labeled accordingly. Free estimate for future electrical needs.