Removed old combustion chamber, gasket, and debris. Installed a new combustion chamber and gasket. Started the boiler and let it run for 25 minutes for the chamber and adhesive to cure. Perform combustion and smoke tests. Pressure relief: Drain pressure from the system. Remove old pressure relief and install new pressure relief. Fill system back up with water. Purge air from all zones. Start and test system for proper operation.