Came out today and removed the old cutoff valve that was not functioning properly. Installed a new, properly sized shutoff valve and reconfigured the water connection to correctly hook up the customer’s bidet. Tested for leaks and verified proper operation. Customer now has a safe, reliable water supply to the bidet with improved functionality.