Technician arrived on site to add a new gas line for a standby generator. Reviewed generator location, gas load requirements, and existing gas system to ensure proper sizing and safe operation. Installed new gas piping from the main gas supply to the generator location, including proper shutoff valve, sediment trap, and approved fittings. All connections were secured and tested for leaks to meet local code requirements. Generator gas line addition completed successfully and ready for connection and operation.