Technician arrived on site to address a busted copper water line. Isolated the water supply and removed a damaged 1-foot section of copper pipe. Installed new copper piping with proper fittings, soldered all connections, and restored water service. System was pressure tested to confirm there were no leaks. Area was cleaned up and repair completed successfully.