Completed a full basement plumbing rough-in today. Installed new drain lines, venting, and water supply lines for future bathroom and utility connections. Tied into the main sewer line and ensured proper slope and venting for code compliance. Pressure tested all water lines and verified secure fittings with no leaks. Basement is now fully prepped for fixtures including toilet, shower, and sink installation. Clean, organized layout for easy access and future finishing.