Completed plumbing rough-in for a barndominium, including running approximately 250 feet of PEX water lines throughout the structure. Installed a new PVC drain, waste, and vent rough-in, ensuring proper layout, slope, and code compliance for future fixtures. All water and drain lines were secured, pressure-checked where applicable, and prepared for final connections.