Completed a tankless water heater replacement today. Removed the existing unit and installed a new high-efficiency tankless system. Updated water connections, gas line, and venting as needed to ensure proper operation and code compliance. Flushed and tested the system, verified gas pressure, checked for leaks, and confirmed proper temperature output at fixtures.