Responded to a call for a busted CPVC water line causing an active leak. Shut off the main water supply and drained the system to prevent further damage. Removed the damaged CPVC section and inspected surrounding piping for heat stress and brittleness. Installed new CPVC piping using proper primer and solvent cement, ensuring correct pipe alignment and support. Allowed adequate cure time before restoring water service. Pressure-tested the repair and verified there were no leaks. Cleaned up the work area and restored full water flow to the home.