We will need to return and push the boots down flush with the Sheetrock. A few of the boots may need additional cutting at the Sheetrock. The gaps between all the boots and Sheetrock will then be sealed with caulking. All old grills will be discarded and all new high-velocity straight grills will be used. We need ten 6-inch grills. We need four 4-inch grills.