Arrived on site to preform 2 system maintenance; indoor, checked filter and cleared drain line, checked electrical connections, amp draw and capacitance. Outdoor; cleaned condenser coils and checked refrigerant pressures. Checked electrical connections, amp draw and capacitance. Both systems are operating within manufacturer specs at this time