Drained and removed the old water heater. Removed old flue pipe and disconnected gas piping. Installed a new Rheem PROG29 gas hot water heater. Installed new flue pipe and modified gas piping as needed. Filled the water heater and started and tested it. Removed old circuit board from the furnace and installed a new one. Started and tested the furnace. Both units are working properly.