Semi-Annual Sprinkler System Inspection Deficiency: 1968 standard response sprinklers are due for 50 year UL testing 2- 165 degree upright 1/2” K factor 4.0 brass 2- 165 degree pendant 1/2” k factor 4.0 chrome Wet sprinkler with Alarm valve is due for the 5 year internal inspection and gauge replacement FDC hydrotest 2- water gauge. Steel threaded pipe 5 hours labor Deficiency: 1968 standard response sprinklers are due for 50 year UL testing 2- 165 degree upright 1/2” K factor 4.0 brass 2- 165 degree pendant 1/2” k factor 4.0 chrome Wet sprinkler with Alarm valve is due for the 5 year internal inspection and gauge replacement FDC hydrotest 2- water gauge. Steel threaded pipe Check valve is behind riser Need lift