William Beers is always professional and very thorough!
Work was done in a timely manner by an excellent technician.
confirmed with Dawn for 7:30. Sprinkler Inspection
Annual Sprinkler System Inspection Deficiency: System is due for a 5 year internal inspection and gauge replacement System is due for 5 year FDC hydro test Storz connection 5 year internal inspection and gauge replacement 5 year FDC hydro test 2 water gauges Need lift for 25'
confirmed with Wayne for 8am Notice of Non Compliance and Repair Proposal Liberty Fire Solutions recently inspected/serviced the fire sprinkler system at your establishment in accordance with applicable state statutes, local fire codes and NFPA guidelines. While inspecting/servicing your fire sprinkler system, it was determined to be "Non-Compliant" per local fire codes. The attached proposal summarizes the non-compliance issues that were found during the inspection/service and the costs and actions needed to correct them. Liberty Fire Solutions strongly recommends that your sprinkler system is repaired so that it will become compliant. The fire sprinkler system as-is will not work properly due to the above referenced deficiencies and may not extinguish, suppress or control a fire. This is a safety hazard and may contribute to damage or injury to your property and individuals in the event of a fire. Please contact me as soon as possible to review the attached proposal and schedule the
confirmed with Amy for 9am. Maintenance, Jay, will meet you Sprinkler and Backflow Inspection
Sprinkler and Backflow Inspection Quarterly Wet and Dry Sprinkler System Inspection Annual Backflow Inspection
confirmed with John One head leaking, 5 need replaced due to rust at same time.
confirmed with Dawn for 7am. Sprinkler Inspection
Deficiency: Replace both sides of packing due smoke coming out of packing Aurora pump Type 6-481-1BB Serial # 12-2261268 Troy wants New bolt replacements for both sides and new packing
NEED CINTAS PAPERWORK Sprinkler Inspection
Semi-Annual Sprinkler System Inspection Deficiency: 1968 standard response sprinklers are due for 50 year UL testing 2- 165 degree upright 1/2” K factor 4.0 brass 2- 165 degree pendant 1/2” k factor 4.0 chrome Wet sprinkler with Alarm valve is due for the 5 year internal inspection and gauge replacement FDC hydrotest 2- water gauge. Steel threaded pipe 5 hours labor Deficiency: 1968 standard response sprinklers are due for 50 year UL testing 2- 165 degree upright 1/2” K factor 4.0 brass 2- 165 degree pendant 1/2” k factor 4.0 chrome Wet sprinkler with Alarm valve is due for the 5 year internal inspection and gauge replacement FDC hydrotest 2- water gauge. Steel threaded pipe Check valve is behind riser Need lift