Confirmed with Justin for Sept 9th Quarterly Sprinkler & Kitchen hood -Needs escusion rings (5) Kitchen Suppression and Sprinkler Inspection
Sprinkler Inspection Confirmed with Justin for Sept 9th Quarterly sprinkler -Needs escusion rings (5)
Confirmed with Bruce for July 25th @8am Annual Ext inspection 1 5lb 6year 1 10lb co2 5year 1 13lb halon 6year 1 10lb 6year Portable Extinguishers Inspection
Notice of Non Compliance and Repair Proposal Liberty Fire Solutions recently inspected/serviced the fire sprinkler system at your establishment in accordance with applicable state statutes, local fire codes and NFPA guidelines. While inspecting/servicing your fire sprinkler system, it was determined to be "Non-Compliant" per local fire codes. The attached proposal summarizes the non-compliance issues that were found during the inspection/service and the costs and actions needed to correct them. The sprinkler systems are due for a 5 year internal inspection and gauge replacement per NFPA 25. NFPA 25 REQUIREMENTS FOR 5 YEAR TESTING: 13.4.1.2 Alarm valves and their associated strainers, filters, and restricted orifices shall be inspected every 5 years unless tests indicate a greater frequency is necessary 13.4.2.1 Check valves shall be inspected internally every 5 years to verify that all components operate correctly, move freely and are in good condition 14.2.1.1 An assessment of the int
Notice of Non Compliance and Repair Proposal Liberty Fire Solutions recently inspected/serviced the fire sprinkler system at your establishment in accordance with applicable state statutes, local fire codes and NFPA guidelines. While inspecting/servicing your fire sprinkler system, it was determined to be "Non-Compliant" per local fire codes. The attached proposal summarizes the non-compliance issues that were found during the inspection/service and the costs and actions needed to correct them. The sprinkler systems are due for a 3 year pressure test of the dry system per NFPA 25. NFPA 25 REQUIREMENTS FOR YEAR TESTING: NFPA 3.4.3.2.6 With the system at normal system pressure, shut off the air source (compressor) for 4 hours. If the low air pressure alarm goes off within this period, the air leaks shall be addressed. Notice of Three Year Dry Sprinkler System Pressure Test Proposal Liberty Fire Solutions recently inspected/serviced the fire sprinkler system at your establishment in acco
Notice of Non Compliance and Repair Proposal Liberty Fire Solutions recently inspected/serviced the fire sprinkler system at your establishment in accordance with applicable state statutes, local fire codes and NFPA guidelines. While inspecting/servicing your fire sprinkler system, it was determined to be "Non-Compliant" per local fire codes. The attached proposal summarizes the non-compliance issues that were found during the inspection/service and the costs and actions needed to correct them. The sprinkler systems are due for a 3 year pressure test of the dry system per NFPA 25. NFPA 25 REQUIREMENTS FOR YEAR TESTING: NFPA 3.4.3.2.6 With the system at normal system pressure, shut off the air source (compressor) for 4 hours. If the low air pressure alarm goes off within this period, the air leaks shall be addressed. Notice of Three Year Dry Sprinkler System Pressure Test Proposal Liberty Fire Solutions recently inspected/serviced the fire sprinkler system at your establishme
Fire Pump and Sprinkler Inspection Annual Fire Pump Annual Sprinkler Inspection
Confirmed with Jon Johnson -VERIFY THE LAST 3 YEAR PRESSURE TEST! Sprinkler Inspection
VERIFY LAST 3 YEAR PRESSURE TEST Sprinkler and Fire Hydrant Inspection
confirmed with Dana Wrye Notice of Non Compliance and Repair Proposal Liberty Fire Solutions recently inspected/serviced the fire sprinkler system at your establishment in accordance with applicable state statutes, local fire codes and NFPA guidelines. While inspecting/servicing your fire sprinkler system, it was determined to be "Non-Compliant" per local fire codes. The attached proposal summarizes the non-compliance issues that were found during the inspection/service and the costs and actions needed to correct them. The Fire Department Connection (FDC) is due for the 5 year hydro-test per NFPA 25. NFPA 25 REQUIREMENTS FOR 5 YEAR FDC HYDRO-TESTING: The intent of this test is to reassure the reliability and integrity of the Fire Department Connection (FDC). A FDC is connected to the sprinkler system so that in the event of a fire the fire department can connect their hoses to these outlets to pump water at a much higher pressure. By helping the system get a much needed boost
See Bob Sprinkler pipe is leaking Sprinkler Service Call
Sprinkler Inspection Annual Sprinkler System Inspection
Confirmed with Jon Johnson Sprinkler Inspection
confirmed with Jon Johson Kitchen hood & Quarterly sprinklers Kitchen Suppression and Sprinkler Inspection