Replaced the upstairs air handler. Reinstalled supply and return plenums and sealed with mastic air lock. Rebuilt primary and secondary drain lines. Installed SS2 and SS3 safety float switches. Cleared and verified drain operation. Pressure tested and pulled a vacuum on the line set. Verified system operation and weighed in charge based on line set length.