Performed heat check. Checked the electrical, mechanical, safety, and performance of the system. I cleared the condensation drain line and flow tested the drain with two gallons of water. I also treated the drain line, The air filter was replaced with a client supplied filter. The system sterilizers and surge protectors are all operational. No major issues were found. The system was running at the completion of service.