Dug up original drain system and then dug a deeper and wider hole for drainage. Blew the drain out to verify the drain was clean and clear and then back filled the hole with pea gravel. Placed some of the original dirt back on top. Verified the cooling system was operational prior to departure. Everything is working at this time.