Perform cooling maintenance on 2024 ton train package heat pump unit. All electronics and pressures are within factory specifications. Unit has a 20° temperature split however I found evaporative coils to be excessively dirty and recommended voltage enhancement for system. Customer decided to have the coils cleaned and install voltage enhancement system, which I didunit was running with an exit temperature. Unit was running with a exit temperature of 55.