Performed cooling maintenance on 2014 Lennox split gas system 3 ton and a 2023 Rheem split with first company air handler found a bad cap on the Lennox unit. Replaced it now all electronics and pressures are within factory specifications. Both units have better than 20° temperature split in both were operational one with a 57° temp sprint in one with a 58° temp split at departure.