Pumped down existing refrigerant to the condenser. Installed new TXV metering device. Installed new liquid line filter drier. Pressure tested system with nitrogen and pulled vacuum. Cleared primary drain with CO2 and primed trap with water. Charged the system with R-410A refrigerant. Everything is working at completion of service.