7 Central Ave
West Lebanon, NH 03784
802-649-7317

Our Top Cities


Job Locations
for hanover, nh


Map of Hanover NH
Zachary  F.

Zachary F.


Job Checkin

-Upon arrival the technicians removed both toilets and water supply lines. The water to the unit had to be turned off to complete the scope of work. There was one gate valve in the ceiling assembly above the water heater. This gate valve turns the water off to the clothes washer valve and kitchen. It also turns the water off to the water heater and kitchen in the unit above. After discovering that the water to the bathrooms in the unit were still under pressure the technicians turned the water off to the whole building and installed two ball valves. One for the hot water in the bathrooms and one for the cold in both bathrooms. After completing this techs were able to remove both vanities, replace 2 toilet shutoffs with compression stops, and remove existing shower. -Second day techs removed the existing tub drain. The drain was plumbed with 1 1/2" copper and 2" cast iron. The copper was removed from the cast iron ptrap. A rubber bushing was used to adapt from the cast iron to pvc. Mo

-Upon arrival the technicians removed both toilets and water supply lines. The water to the unit had to be turned off to complete the scope of work. There was one gate valve in the ceiling assembly above the water heater. This gate valve turns the water off to the clothes washer valve and kitchen. It also turns the water off to the water heater and kitchen in the unit above. After discovering that the water to the bathrooms in the unit were still under pressure the technicians turned the water off to the whole building and installed two ball valves. One for the hot water in the bathrooms and one for the cold in both bathrooms. After completing this techs were able to remove both vanities, replace 2 toilet shutoffs with compression stops, and remove existing shower. 

-Second day techs removed the existing tub drain. The drain was plumbed with 1 1/2" copper and 2" cast iron. The copper was removed from the cast iron ptrap. A rubber bushing was used to adapt from the cast iron to pvc. Mo -Upon arrival the technicians removed both toilets and water supply lines. The water to the unit had to be turned off to complete the scope of work. There was one gate valve in the ceiling assembly above the water heater. This gate valve turns the water off to the clothes washer valve and kitchen. It also turns the water off to the water heater and kitchen in the unit above. After discovering that the water to the bathrooms in the unit were still under pressure the technicians turned the water off to the whole building and installed two ball valves. One for the hot water in the bathrooms and one for the cold in both bathrooms. After completing this techs were able to remove both vanities, replace 2 toilet shutoffs with compression stops, and remove existing shower. 

-Second day techs removed the existing tub drain. The drain was plumbed with 1 1/2" copper and 2" cast iron. The copper was removed from the cast iron ptrap. A rubber bushing was used to adapt from the cast iron to pvc. Mo