During the work to perform the repipe, we were unable to locate the line that feeds the kitchen island. In order to route new water lines to the island, we will need to sawcut and remove a strip of floor tile and concrete leading from the wall where the refrigerator is located toward the south end of the kitchen island. This work was not included in the previous contract.