Install 2 ton 15 Seer rude removed old air handler and condenser installed new air handler on existing wall stand flush copper flush drain modified supply Plenum with mechanical fasteners and he chose necessary re-installed a brand new condensation pump removed old pump wired contracting will need to come out to install us 115 V receptacle in closet for condensation pump condenser in existing location on brand new hurricane rated had started system up and charged to factory specs upon start up charge system to factory spec instructed homeowner on usage of brand new AC system change breakers accordingly we will need to have Wired contracting out to install receptacle in closet before the completion of the inspection job is complete besides. Receptacle in closet