Built and installed new extended supply plenum. Attached and sealed existing flex duct to the new plenum with new collars. Sealed ductwork connections with mastic/hardcast. Sealed all supply buckets to the Sheetrock with foam spray gun. Pulled the blower motor and cleaned wheel/housing. Cleaned evaporator coil. Cleaned out the return chase underneath the air handler. Rebuilt primary drain, cleared with CO2 and primed trap with water. Checked 50/5 condenser capacitor and sprayed js685 inside panel. Tested operation of system. Everything is working at completion of service. Payment Due 9/17/2025