Installed new heatpump system. Added new extended supply and RA plenums. Rebuilt drain line with SS-1 and SS-2 safety switches. Added new line filter drier, and pressure tested system for extensive leak check. Pulled deep vacuum, and weighed in factory charge. Everything is working at completion of install.