Installed new 2-ton Carrier system for the upstairs. Added new drain pan and vibration isolators. Rebuilt drain line with insulation and support. Added new return and supply plenums and sealed all pressure points with air lock. Ran new control wiring for the outside unit and installed new Ecobee Pro thermostat. System operating at this time.