The technicians installed a new condenser and two evaporator coils. We made sure everything was up to code and working properly as well as adjusted charge and air sealed the coils with mastic.
Installed new full A/C system. Installed two new thermostats one for the Garage zone and the other for the Upstairs zone. Technicians ran a new copper line set. Installed new zone board to control both zone dampers. InstalledNew hefty feet under outdoor unit for snow grade. Technicians performed an A/C start up. System works great at this time and verified that both zones are operable.