Redo all of the sewer lines under the house. There are two bath, home house, one kitchen and one laundry room. We will bring the sewer lines out the same way that they are going right now but they will be installed correctly. Also, we will need to install a Pump station with the septic tank. Because where the land part on the house is on the opposite side of the house. So we will need to install the pump station to pump to the field lines on the other side of the house. That is approximately 150 to 200‘ that we will have to run a line from this pump station to the field lines. We will install a 1000 gallon septic tank. The pump station will be at 500 gallon tank with the sewer injector pump inside a bit. After all of this is completed, everything will be up to code and installed correctly. We will need to get excavators out here to be able to dig trenches and to be able to install the pump station and the septic tank. For the electrical we will need to run 2 120 V wires to the pump sta
Came out and gave estimate for sewer system as soon as everything gets in, we will be able to come out and start the work.