Completed a full maintenance on a heat pump system. Updated the customer that soft start kit will be installed when we’re gonna get the part in our end. Checked refrigerant levels and temperature. Tested capacitor. Tested water pump. Drained, condensate line. Tested compressor and fan amps. Tested the float switch. Took temperature split on supply and return. Tested blower fan amps. System is running and operating at this time.