- Raise steel well casing by welding a coupling and 18" extension on the existing. We are assuming the well head is flush to the ground and that excavation is not required. - Install a new well cap, Bucks County Health department approved and vermin proof. - Chlorinate the well. - Install an 8 GPM UV light system and we are assuming there is an existing pre-filter. - Install a sample port post UV for final water testing (bacteria coliform and E.coli)