Built and installed new supply plenum. Reattached existing 16 inch round dampers and bypass to the new plenum. Sealed all connections with mastic / hardcast. Cleared primary drain with CO2 and primed trap with water. Tested operation of the system and dampers / zone control. Everything is working at completion of install.