Installed new evaporator coil with case. Sealed connections with mastic and hardcast. Installed new liquid filter drier relocated to attic. Pressure tested system with nitrogen and pulled vacuum. Rebuilt primary and secondary condensation drain. Cleared drain with CO2 and primed trap with water. Charged AC with R-410A refrigerant according to subcool chart on unit. Tested operation of system. Everything is working at completion of service.