Preformed duct sealing on all triangles and buckets upstairs. Removed RAFG and cleaned out R/A chase, and also cleaned coil in place. Restored cabinet to clean condition and sealed all straws and penetrations. Cleaned primary drain pan and flushed it with hot water. Installed power pack and UV lights in cabinet. Also installed outdoor EasyStart kit and verified system operation. Everything is working at this time.