Installed new Carrier/Payne straight electric 2.5-ton system. Replaced the plenum and sealed with mastic airlock. Rebuilt condensate drain line and insulated it. Added SS-2 safety switch to drain line. Replaced inline filter dryer, pressure tested with dry nitrogen and pulled a vacuum on copper line set. Charged system to factory specs and replaced the condenser breaker. System is working properly at this time.