Removed old trunk line and cut back sheet metal ducting. Built a new plenum trunk line and spliced onto existing sheet metal ducts with new flex ducts. Replaced buckets in utility room and bedroom closet. Sealed all connections with mastic air lock. Completed duct cleaning on older duct work and charged system to manufacturers specifications. Cleared the condensate drain line. Everything is operational at this time.