Removed and replaced evaporator coil upon approval. Added liquid line filter drier. Pressure tested system. Vacuumed system below 500 microns. Added 8 pounds 410a. Checked pressures, temperatures, and amp draws. All within factory specifications. This is a fixed metering device. Flushed drain assembly. System is working and draining properly. - Collin