The following discrepancies were found during your Semi Annual Fire Inspection that needs to be corrected for Compliance Incorrect nozzle coverage over range. Need to replace NL-2LP nozzle with NL-2W and add 1 NL-1P nozzle.
Semiannual Kitchen Inspection Annual Fire Extinguisher Inspection Scheduled with Katherine via email Lisa 973-713-9720
Semiannual Kitchen Inspection (3) Annual Fire Extinguisher Inspection Scheduled with Lisa 973-713-9720
Semiannual Kitchen Inspection (3) Annual Fire Extinguisher Inspection Scheduled with Lisa 973-713-9720
Recharge 4 Gallon system, went off during construction. Bryan 201-274-6003
Scheduled with Will Riggs 862-432-9746 Furnish necessary parts and labor to complete the following repairs per manufacture specifications and code requirements: -- Perform (1) 12 year hydro-test on the Range Guard 6 gallon bottle
Semiannual Kitchen Inspection Scheduled with JR 973-525-3220
They are there at 6am, check back door. Schedule with Dan 973-222-1391 Semiannual Kitchen Suppression Systems
SEE IF HE WANTS ONLY THE MAIN KITCHEN INSPECTED, THE OUTSIDE HOOD WILL BE WINTERIZED IN NOVEMBER Semiannual Kitchen Inspection Annual Fire Extinguisher Inspection Scheduled with Will Riggs 862-432-9746
Deliver (3) 50LB CO2 Cylinders and (1) 20LB CO2 Cylinders. Called in by Victor 973-697-6766.
*SPECIAL PRICING** **(I ATTACHED NEW PRICING TO THIS JOB)** Semiannual Kitchen Inspection Scheduled with Jule 973-663-5780