Today I arrived on site and performed a winter time maintenance on your HVAC equipment. **Indoor Unit (Air Handler in Attic):** * Verified the overall equipment condition as good. * Confirmed the indoor coil is clean and in good condition. * Checked the 1" pleated filter (18x18x1) and noted its condition. **Outdoor Unit (Heat Pump at Back of Building):** * Verified the outdoor coil is clean and in good condition. **Electrical Components:** * Tested and confirmed proper operation within manufacturer specifications for: * Blower Motor * Heat Strip Kit * Condenser Fan Motor * Compressor * Compressor Run Capacitor * Fan Run Capacitor * Contactor * Electrical Wiring **System Components:** * Inspected and confirmed good condition and proper operation of: * Blower Wheel * Primary Drain Pan * Electrical Wires Secured * Ductwork **Measurements:** * Recorded a return air temperature of 72.0°F and a su