Today I arrived on site and performed a winter time maintenance on your HVAC equipment. **Indoor Unit (Air Handler - 1st Floor):** * Verified the indoor coil is in good condition. * Confirmed the blower wheel is in good condition and working properly. * Noted the customer will provide their own antimicrobial filters (size: 13.75x29.75x1). **Outdoor Unit (Side of Building):** * Verified the outdoor coil is in good condition. * Confirmed the condenser fan motor and contactor are working properly within manufacturer's specifications. * Confirmed electrical wiring is working properly within manufacturer's specifications. * Verified electrical wires are secured. **Condensate Drain System:** * Cleared the drain line. * Cleaned out the primary pan, secondary pan, and condensate pump. * Confirmed the drain line is strapped. **Measurements & Other:** * Carbon monoxide levels tested at 0.00 PPM. * Return air temperature: 70.0 Degrees Fahrenheit. * Supply air tem