Ruud 2 Stage Heat Pump Full system horizontal install includes: Remove and dispose of existing equipment and materials,Install new air handler in existing location, Install new outdoor unit and pad at existing location to code, New hang kit, drain pan, float switch. Safety overflow switch for drain line. Verify proper condensate drainage with Drain Solve. Mastic seal immediate duct connections. Recover refrigerant per EPA standards. Flush line-set. Charge system to ensure maximum efficiency. Adjust fan speed if necessary to accommodate static pressure of ductwork. Electrical safety: We will ensure your system is installed safely and according to code. Any unforseen electrical not included in initial proposal will be at the expense of the homeowner. Complete clean-up including drop cloths and shoe covers. Permits and Inspections of AHRI certified equipment to code. All work to be performed in a neat and professional manner in accordance with existing codes by trained technicians. 1